Bicycle Board Members,

FYI, I submitted the following (not on behalf of the BB but just myself):

Comments submitted to Greg Bailey, WVDOH January 24, 2012

I'm writing on the WV 705 Connector project as a Morgantown bicyclist and pedestrian.  After having attended the January 24, 2012 public meeting at Easton Elementary School as well as previous meetings on this project, I offer the following recommendations.  

1. Install roundabout at Mileground/Airport Blvd. intersection.  This roundabout will enable continuous flow on Mileground between and around the roundabouts.  

2.Install mountable median instead of currently preferred center turn lane.  Center turn lane (suicide lane) crash statistics prove that center turn lanes are extremely dangerous and unjustifiable in any modern design.  

3. Post speed limit at 35 mph or less.

4. Install R4-11 Bicycles May Use Full Lane signs throughout the corridor.

5. Install sidewalk on the north side of Easton Hill to enable pedestrians from the West Run Valley to walk to Mileground.

6. Install sidewalk on east side of 705 between Mileground and Chestnut Ridge Rd. to enable pedestrians to walk between Mileground and Suncrest Town Center.  (Rudimentary bicyclist and pedestrian connections between Suncrest Town Center and WVU Research Park, Monongalia General Hospital and businesses in Suncrest currently exist and justify pedestrian connection of Mileground to the Chestnut Ridge Rd. area.)

I appreciate your fair consideration of these recommendations.

Frank

Begin forwarded message:

From: Damien Davis <ddavis@cityofmorgantown.org>
Date: January 25, 2012 8:46:15 AM EST
To: William Wyant <wwyant@hsc.wvu.edu>, mmccabe@cityofmorgantown.org, wes@wnugent.com, Jeff Mikorski <jmikorski@cityofmorgantown.org>, j4im3s@gmail.com, "mckain, david" <david.mckain@gmail.com>, "Henry, Adam" <Adam.Henry@mail.wvu.edu>, christophergluck@gmail.com, psteel@access.k12.wv.us, "Gmeindl, Frank" <frank.gmeindl@comcast.net>, Andrea Soccorsi <Andrea.Soccorsi@Mail.WVU.edu>, Barbara Shellito <bshellito@cityofmorgantown.org>, Christiaan Abildso <Christiaan.Abildso@mail.wvu.edu>, Ken Martis <kmartis@wvu.edu>, Margaret Roberts <Margaretormike@aol.com>, Roy Nutter <rnutter@wvu.edu>, Trevor Lloyd <tlloyd@cityofmorgantown.org>
Subject: WV 705 Connector (Mileground Widening Project)
Reply-To: ddavis@cityofmorgantown.org

All, 

Attached is the handout from DOH's public meeting concerning the 705 Connector project. At the back of the handout is a form for comments. Comments can also be made by visiting the link below:

http://www.transportation.wv.gov/highways/engineering/comment/wv705connector/Pages/default.aspx

The DOH will be accepting comments until Friday, February 24, 2012. 

J. Damien Davis, PE, CFM
Assistant City Engineer
City of Morgantown
Public Works Department - Engineering Division
389 Spruce Street
Morgantown, WV 26505
Office: 304.284.7398
Fax: 304.284.7409